KPI Green Secures 305 MW Solar Power Project from Aditya Birla Group

KPI Green Energy Ltd. has successfully secured a substantial order to develop solar power projects with a combined capacity of 305 MW, as revealed in a recent stock exchange notification. This significant milestone reflects the company’s commitment to advancing renewable energy solutions.

Project Allocation by Aditya Birla Group

Out of the total 305 MW capacity, Aditya Birla Renewables Subsidiary Ltd. has allocated 175 MW, while the remaining portion is entrusted to ABREL (RJ) Projects Ltd. The collaboration is part of a larger wind-solar hybrid power project, strategically located in Gujarat.

Project Timeline and Completion Date

The solar power project is scheduled to be completed within the financial year ending March 2026. The development will play a crucial role in meeting the growing demand for clean and sustainable energy in the region.

Integration with Central Transmission Utility

According to the exchange filing, the solar project will be seamlessly integrated into the Inter State Transmission System network of the Central Transmission Utility, ensuring efficient energy distribution across the grid.

Positive Impact on Stock Prices

The renewable energy sector’s positive outlook has had a notable impact on the stock market. KPI Green Energy’s stock, reflecting the increased optimism, has witnessed a remarkable gain of over 80% in the year 2024. This surge continued, with the stock ending higher by over a percent on the most recent trading day.

This collaboration reinforces KPI Green Energy’s position in the solar energy market, aligning with the global shift towards sustainable practices. As the company contributes to the development of solar technology and expands its portfolio, it plays a pivotal role in shaping the future of clean energy.

Source:bloombergquint.com

Like and Follow Us:
Verified by MonsterInsights